To set up an enterprise calendar using an
Oracle EBS source system:
1. In the DAC, display the Design tab, and
select an appropriate adapter.
2. Display the Source System Parameters tab.
3. Set the value of $$GBL_CALENDAR_ID and $$GBL_DATSOURCE_NUM_ID
as
follows:
■ GBL_CALENDAR_ID:
This parameter is used to select the
Enterprise Calendar.
It should be the
MCAL_CAL_NAME~MCAL_PERIOD_TYPE for Non-Generated Calendars. For example
GBL_CALENDAR_ID will be 'Accounting~41', if the Enterprise Calendar
id='Accounting' and the calendar period_type='41'.
■ GBL_DATASOURCE_NUM_ID:
If Enterprise Calendar is not a Generated Calendar:
Should be the DATASOURCE_NUM_ID of the source system from where the Calendar
definition is taken.
(Example: If we have two Data source as
PeopleSoft and Oracle, and our Global Calendar is from Oracle source, then parameter
value should be of Oracle source.)
Note: The tasks that load the Enterprise
calendar will run as part of the execution plan for your subject area. Please
note that is no separate subject areas for common dimensions. They are included
in the core subject areas.
No comments:
Post a Comment