When you generate a load plan, the
load plan is built in the ODI Repository. A load plan must be generated
successfully before it can be executed.
Note: Load plans must be generated
serially or the process will fail. Do not launch a second load plan generation
if one is already underway. You must wait until the first generation process
completes before you launch the next generation process.
To generate a load plan:
- In the Tasks pane of Oracle BI Applications Configuration Manager, select Manage Load Plans, which appears under the Load Plans Administration heading.
The Manage Load
Plans page is displayed.
- In the Load Plans master list, select the load plan you want to generate.
- In the Load Plans toolbar, click the Generate icon.
The following
icons show the possible generation statuses that appear in the Generation
Status column in the Load Plan master list. Click the Refresh icon to refresh
the display.
Generation Status Icon
|
Description
|
|
Starting
|
|
In Progress
|
|
Succeeded
|
|
Failed
|
You can execute a load plan or
schedule it for execution after it has been successfully generated.
No comments:
Post a Comment