Copying Load Plans



Follow this procedure to make a copy of an existing load plan.
To make a copy of an existing load plan:
1)   In the Tasks pane of Oracle BI Applications Configuration Manager, select Manage Load Plans, which appears under the Load Plans Administration heading.
The Manage Load Plans page is displayed.
2)   In the Load Plans master list, select the load plan you want to copy.
3)   In the Load Plans toolbar, click the Copy icon.
The Copy Load Plan page is displayed.
4)   On the first page of the Copy Load Plan series, specify the following information:
Field
Description
Name
Enter a unique name for the load plan.
Description
(Optional) Enter additional information about the load plan.
Load Plan Type
(Optional) Select a load plan type. Possible values are the following:
o   Source Extract (SDE)
o   Source Extract and Load (SDE, SIL and PLP)
o   Warehouse Load (SIL and PLP)
o   Domain-only Extract and Load (SDE and SIL)
Source Instances
(Optional) Select the data sources from which the fact groups will be selected.
5)    
6)   Click Next.
The second page of the Copy Load Plan series is displayed.
7)   In the Available Fact Groups tab, select the fact groups you want to include in the load plan definition.
Note that fact groups may belong to a hierarchy of fact groups. You can select only the top level parent fact group and not a child fact group.
A load plan must contain at least one fact group, and multiple fact groups may be selected from one or more data sources.
8)   Click Save. A submenu is displayed with the following options
o   Click Save to save the load plan. After a load plan is saved, it is displayed in the Load Plans master list.
o   Click Save and Generate Load Plan to save the load plan and immediately generate it.

No comments:

Post a Comment